Interim Training Center (ITC) Ph II

Interim Training Center (ITC) – Phase II

Project Overview

Design-Build two (2) 6,000 SF Commercial Modular Buildings for the Federal Government to be used for training and administrative use.  

The buildings were designed and built to SCIF specifications with the required STC ratings, access controls and door hardware. Site work included the installation of MEP systems, gas back-up generator, automatic transfer switch and fiber optic pathways.

Industry 
Government

Type of Building
Commercial Modular Building (CMB)

Location
Redstone Arsenal
Huntsville, AL

Project Photos

Return to Projects
Share by: